Quintin Hand

  • signed Line5 eis 2023 2023-10-13 18:07:11 -0500

    Sign Our Petition to the Army Corps

    The U.S. Army Corps of Engineers announced in March 2023 that it extended its environmental review of Enbridge Energy's Line 5 Straits Tunnel Project. The project's Environmental Impact Statement was previously set to be finished by late this year but now will be issued no earlier than Spring 2025.

    While Local 798 members are supportive of a comprehensive permitting process that ensures opportunity for review and comment, we are disappointed with the extended timeline on this project's already thorough environmental impact analysis. Join us in sending a message to the Army Corps in support of a swift review so construction can finally move forward.

    Dear Secretary:

    I stand with Pipeliners Local 798 in expressing disappointment in the U.S. Army Corps's decision to extend its environmental review of Enbridge Energy's Line 5 Straits Tunnel Project. The permitting process for Line 5 already ensured extensive opportunity for review and comment, through which Enbridge repeatedly demonstrated a commitment to maintaining the highest level of safety and environmental responsibility.

    Enbridge's proactive dedication to safety includes diligent 24/7 monitoring of the Straits crossing, regular inspections and operating the line at less than 25 percent of its maximum design capabilities to minimize stress on the pipeline steel and enhance safety. In November 2017, the company formally entered into an agreement with the state of Michigan outlining seven actions Enbridge was taking to protect the state’s water bodies within the project footprint. The following year, Enbridge announced another agreement with the state of Michigan that put in place enhanced inspection and operations protocols for the project. In the years that followed, Enbridge has continued to work closely with landowners, tribal leaders and safety experts to ensure the safest and most efficient pipeline operation.

    There are several reasons why I believe the Line 5 Straits Tunnel Project deserves swift approval from the Army Corps and other decision makers, including:

    • Enbridge has a proactive inspection program to monitor the fitness of Line 5, including evaluating the pipe’s interior inch by inch every five years using in-line inspection tools that provide detail on par with MRIs in the medical industry;
    • All products that enter the pipeline are inspected and treated to prevent corrosion, and the system is operated at a low pressure to minimize stress on the pipe – all in an effort to protect the pipeline and the Straits;
    • Over the past several years, Enbridge has paid tens of millions of dollars in property taxes in the state for its energy infrastructure projects, which has been invested in schools, roads and bridges and other important public services;
    • The Line 5 Straits Tunnel Project will create good jobs for the local workforce, many of whom include Local 798 members.

    The permitting process for Line 5 already ensured more than adequate opportunity for review and comment, through which Enbridge has demonstrated a clear plan with the project to help ensure an uninterrupted supply of reliable, affordable energy to Michigan and the region. This is why I ask the Army Corps to efficiently complete this review and approve necessary permits without any further delay.

    Signed,

    [Names Below]

    **Local 798 may submit this petition to state and federal regulators and other decision makers to support Line 5.**

  • signed simon icc iub 2023-10-13 18:06:53 -0500

    Sign Our Comment

    Over the course of two weeks in September, we prepared submissions - with more than 2,300 comments - to the Illinois Commerce Commission (ICC) and Iowa Utilities Board (IUB), as they accepted public comments on permits for the Mt. Simon Hub project, a pipeline proposed by Wolf Carbon Solutions and Archer Daniels Midland Company that will stretch from eastern Iowa into Illinois. Specifically, the project is seeking from the Illinois Commerce Commission a "Certificate of Authority to Construct and Operate a Carbon Dioxide Pipeline and when Necessary to take Interests in Property as Provided by the Law of Eminent Domain"; and from the Iowa Utilities Board a Hazardous Liquid Pipeline permit.

    Thank you to all who signed our comment for submission! If you signed after September 21, we may include your name in future submissions to state and federal regulators to support this project.

    Dear Secretary:

    On behalf of United Association of Journeymen and Apprentices of the Plumbing and Pipe Fitting Industry of the United States and Canada (UA) and our more than 300,000 members, I want to express our continued support for the Mt. Simon Hub and encourage a thorough review and timely approval of this important project. We believe that Wolf Carbon Solutions’ Mt. Simon Hub will be integral to job creation, environmental improvement and long-term economic growth of our region.

    As a proud UA member, I am excited at the prospect of playing a central role in making this project a reality. With the potential to create more than 2,700 construction jobs, generate over $478 million in wages and salaries and to contribute upwards of $75 million in state and local taxes for our state, the Mt. Simon Hub presents an extraordinary economic opportunity both for our union members and Illinois and Iowa overall.

    The hardworking men and women of the UA will bring their extensive construction experience to bear to ensure that the Mt. Simon Hub is built to rigorous specifications and in compliance with strict federal and state standards. At the UA, we adhere to our Standard of Excellence in every project we work on. This Standard is made up of three pillars: safety, quality and productivity, each of which are essential to making our laborers the best-trained and highly-skilled in the world.  Furthermore, we boast a five-year apprenticeship program that was the first nationally registered program recognized by the Department of Labor in the United States.

    With the possibility of major economic and environmental benefits, my fellow union members and I are excited by the opportunity that the Mt. Simon Hub presents, and we urge you to approve Wolf Carbon Solutions’ application. Thank you for your consideration.

    Signed,

    **By signing this petition, I agree to share my name on Pipeliners Local 798's submission to the Illinois Commerce Commission (RE: Docket No. 23-0475) and to the Iowa Utilities Board (Docket No. HLP-2022-0002)**