John J Bradford
-
John J Bradford signed MVP Southgate NC DWR Comment 2025 via Jerry Crabtree 2025-06-17 08:46:30 -0500
Comment Period Ends July 5: Sign Now
In early June 2025, the U.S. Court of Appeals for DC upheld a decision by the Federal Energy Regulatory Commission that granted Mountain Valley Pipeline project developers more time to complete its Southgate Project in Virginia and North Carolina. That same week, MVP filed a request with the North Carolina Department of Environmental Quality — specifically the NC Division of Water Resources — for a 401 Individual Water Quality Certification.
The NC DEQ is accepting public comments on this certification application through 5:00 p.m. EDT on July 5. Add your name on our comment below in advance of this deadline, and support MVP Southgate!
RE: Water Quality Certification for MVP Southgate Project; 20181638 Ver 4; Rockingham County
Dear Secretary:
I stand with Pipeliners Local 798 in support of the Mountain Valley Pipeline Southgate Project as it seeks key permits from state regulators. This project represents an investment totaling hundreds of millions of dollars in the economic and energy future of Virginia and North Carolina. It is also primed to put American craftsmen in the region to work, many of whom are members of Pipeliners Local 798.
The project not only brings significant economic benefits, including more than $10 million in tax revenue across the project area and hundreds of pipeliner jobs, it is also being developed with a commitment to mitigating potential environmental impacts. Federal regulators recognize this commitment, and it has influenced their decision to give favorable opinions on the project. FERC staff stated that the project's potential adverse environmental impacts would be reduced to “less-than-significant levels" through implementation of its recommendations.
I support MVP Southgate, and I am advocating during this particular comment period, because this project:
- invests $21 million directly in North Carolina's economy, as well as an anticipated tax revenue in the state of $2 million during construction;
- supports more than 200 jobs in North Carolina alone;
- helps meet the spiking need for natural gas in the region, including new natural gas customers served by Dominion Energy North Carolina;
- has consistently demonstrated a commitment to environmental sustainable goals by making hundreds of route adjustments in response to feedback collected during the pre-filing process. These alteration were made to protect streams, wetlands and cultural resources, as well as to minimize — or avoid — potential impacts to sensitive areas.
MVP Southgate is a central part of making a reliable supply of natural gas available for residents and small business owners in the region, and it is clear to me that the project will be developed and maintained in a manner that respects the environment and reflects stakeholder feedback. This is why I ask that you issue necessary approvals for this project without delay.
Respectfully,
[Names below]
-
Sign Our Petition to FERC
In October 2024, Williams Companies filed an application with the Federal Energy Regulatory Commission (FERC) for the Southeast Supply Enhancement Project, a substantial expansion of the existing Transco pipeline’s system.
Nearly 2,400 advocates signed our petition below that we submitted to FERC on June 6, 2024 to support this project during its public scoping comment period. We will continue to collect signatures in anticipation of upcoming comment periods with our federal and state regulators. Be sure to add your name!
Dear [Official]:
I stand with Pipeliners Local 798 in support of the Southeast Supply Enhancement project, a critical expansion of the natural gas infrastructure network in Virginia, North Carolina, South Carolina, Georgia and Alabama, and the first large-scale takeaway expansion to be announced in the area since the long-delayed Mountain Valley Pipeline.
This system enhancement will help meet skyrocketing demands for affordable, reliable energy by moving more than 1.5 billion cubic feet of natural gas per day to its delivery network, a significant capacity increase that will be enough to power five or six new large, combined cycle plants and will ultimately move this domestically sourced gas to millions of American homes and businesses.
Williams has long demonstrated its commitment to ensure thorough consultation and cooperation with state, local and federal regulatory agencies, as well as community stakeholders throughout the permitting process. This is of particular importance for large scale projects such as this and it includes working with community members and industry experts to identify potential environmental issues or concerns and then to potentially modify the project design to further minimize possible impacts.
Below are just a few specific reasons why I support this project:
- The expansion will add enough natural gas pipeline capacity to meet the needs of 8.6 million homes, enabling Transco to address the growing natural gas-fired power generation, commercial, residential and industrial demand in the mid-Atlantic and southeast United States.
- The increase in pipeline capacity will encourage southern utilities to build new gas plants, opening the region to a generational investment in natural gas while strengthening grid reliability and driving down energy costs at a time when many families are struggling to handle their monthly bills.
- More urgently, the project will create good jobs for skilled industry craftsmen in the region, many of whom are long-time members of Pipeliners Local 798, as well as provide an economic boost to communities along the route.
The Southeast Supply Enhancement Project is poised to be a critical component of the region's energy infrastructure network – supporting good jobs, increasing access to domestically sourced natural gas and generating needed economic benefits. This is why I urge FERC and other agencies to issue necessary permits to ensure it remains on schedule.
Signed,
**By signing this petition, I agree to share my name on Pipeliners Local 798's submission(s) to federal and state decision makers in support of the Southeast Supply Enhancement project.**
-
Sign Our Petition Supporting Ridgeline
Enbridge is working with the Tennessee Valley Authority to design, construct and operate the Ridgeline Expansion Project, an expansion of Enbridge’s existing East Tennessee Natural Gas (ETNG) system. Ultimately, this would provide affordable and domestically sourced natural gas for the utility’s customers as the system continues to transition to cleaner energy.
Pending the receipt of all necessary permits, construction would begin in 2025 with a target in-service date of fall 2026. Sign our below petition that we will submit to respective decision makers as this project moves through the permitting process.
Dear [Secretary]:
I am proud to support Enbridge and the Tennessee Valley Authority as they develop the Ridgeline Expansion Project, a critical investment into the energy and economic future of Tennessee and the surrounding region.
Project construction will support good jobs for local craftsmen, many going to Pipeliners Local 798 members. Once complete, this expansion will provide Tennesseans with a lower-carbon, cleaner-burning energy source.
I support the Ridgeline Expansion Project for the following key reasons:
- The project is designed to meet the rising demand for natural gas, providing affordable and cleaner energy for the utility’s customers;
- The majority of the proposed route would be located within the existing system's right-of-way, which minimizes impacts to landowners and the environment;
- I understand the quality of work that Pipeliners Local 798 members and other regional craftsmen will put into this project to ensure its efficiency, safety and reliability. Local 798 workers have delivered on energy infrastructure projects like this for decades.
Simply put, projects like the Ridgeline Expansion Project are necessary to meet the rising demand for natural gas. This clean-burning energy currently fuels one-third of electric power generation and heats approximately half of all U.S. homes. This project will help more families and businesses in Tennessee realize the full advantages of this abundantly available resource.
I encourage FERC to issue necessary permits without delay, allowing the Ridgeline Expansion Project to meet its proposed in-service date in 2026.
Signed,
[Names below]
-
i am totally for this project
Northern Access
About the project
As the fourth largest natural gas consuming state in the country, New York runs on natural gas. Integral to the New York state economy, the use of natural gas and the pipeline infrastructure that delivers gas from neighboring states not only provides clean, homegrown, abundant, reliable and affordable energy, but also provides good-paying jobs and hundreds of millions of dollars in revenue for communities nationwide.
The Northern Access pipeline will provide an outlet for natural gas production in north-central Pennsylvania, connecting it to the interstate pipeline system. That system connects to markets in the northeastern U.S. and mid-Atlantic regions as well as eastern Canada. The new sections of pipeline will interconnect specifically with the existing Trans Canada and Tennessee Gas Pipeline systems.
The project awaits a clean water certification from the New York State DEC before construction can begin.
Click here to view the project website.
-
I am for this pipeline project
Mountain Valley
About the project
MVP received federal approval in June 2023. The U.S. Supreme Court ordered in August for construction on MVP to resume, granting a request to lift lower court orders that had halted the project and (again) delayed its completion.
In April 2022, the Federal Energy Regulatory Commission amended Mountain Valley Pipeline's 2017 Certificate of Public Convenience and Necessity, supporting project completion under water bodies with specific construction methods. MVP, which is already 94% complete, still needs authorization from other agencies for work in remaining streams and wetlands.
With a vast supply of natural gas from Marcellus and Utica shale production, MVP is expected to provide up to two million dekatherms per day of firm transmission capacity to markets in the Mid- and South Atlantic regions of the U.S.
You can learn more about MVP on its project website.
-
Sign Our Petition Supporting Hydrogen Pipelines
Upgrading and modifying existing gas pipelines and midstream infrastructure to carry biofuels and low-carbon hydrogen would generate good jobs for our nation’s construction workforce and boost economic activity while supporting low-carbon goals.
Sign our petition below supporting hydrogen pipeline infrastructure and the jobs that these projects will provide to craftsmen across the country, including many Local 798 members.
As a forward-thinking supporter of a strong energy industry, I join Pipeliners Local 798 in support of utilizing existing infrastructure and developing new pipelines for the purpose of transporting renewable hydrogen.
By making lines hydrogen-capable, we can best prepare for a responsible energy future while helping to grow opportunities for industry craftsmen across the nation, many of whom are members of Pipeliners Local 798, a trades union representing the most highly trained, skilled and dedicated men and women in the energy industry.
The U.S. has a robust natural gas transportation and storage network – approximately three million miles of natural gas pipelines run throughout the nation – yet, these critical pipelines could become stranded assets within decades, as government leaders push towards aggressive carbon emission goals. This presents both a tremendous challenge and opportunity to utilize the existing pipeline network to also transport other clean-burning energy sources like renewable hydrogen.
While I believe that natural gas should play a vital role in our energy system for years to come, I recognize the growing urgency to invest in renewable energy sources. Modifying gas pipelines and midstream infrastructure to carry biofuels and low-carbon hydrogen is smart strategy, as these projects generate critical economic activity, support good jobs and ensure the delivery of reliable, clean energy to American homes and businesses.
I support investment in renewable hydrogen pipeline infrastructure for the following key reasons:
- Utilizing existing infrastructure for renewable hydrogen distribution supports good job opportunities for industry craftsmen and generates critical local and state economic activity;
- While renewables like solar and wind are limited by electrical grids, hydrogen can be efficiently transported by pipelines, which are built and maintained by a skilled workforce of pipefitters, welders and other craftsmen who depend on infrastructure projects to provide for their families;
- Hydrogen in distribution pipelines would help decarbonize industrial processes, supporting environmental goals.
Upgrading and modifying existing gas pipelines and midstream infrastructure to carry hydrogen would generate good jobs for our nation’s construction workforce and boost economic activity while supporting low-carbon goals. This is why I urge decision makers to join me in supporting these critical infrastructure projects.
Signed
[Signers below]
-
John J Bradford signed Delta Lateral Project FERC Comment via John Williams 2022-01-02 15:55:20 -0600
Sign Our Comment to FERC
The Delta Lateral Project will expand natural gas capacity of Kern River Gas Transmission's existing transmission system in Utah while supporting good jobs for local craftsmen.
In December 2021, Local 798 submitted the below petition with 2,080 signatures to the Federal Energy Regulatory Commission regarding the project’s draft Environmental Impact Statement. In February 2022, FERC released the final DEIS. In anticipation of more public comment periods ahead, please sign this petition that we will submit to other regulators and decision makers in support of Delta Lateral.
Dear Secretary Bose:
I stand with Pipeliners Local 798 in support of Kern River Gas Transmission Company's Delta Lateral Project. This important project will enable Kern River to meet rising natural gas demands in the area and will support good jobs for local craftsmen, including Local 798 members.
In its draft EIS, FERC found the project’s environmental impacts would be reduced to “less-than-significant levels”due to the minimization and mitigation measures proposed by Kern River and recommended by the Commission. Project leaders remain committed to these mitigation efforts and continue to collaborate with stakeholders and environmental experts to develop the most responsible and efficient development plan. I see no reason to alter this review in the final EIS.
Overall, I support the Delta Lateral Project for the following reasons:
- Project leaders have consistently collaborated with stakeholders and environmental experts to ensure it meets or exceeds federal safety standards while developing the most efficient and responsible pipeline route;
- Delta Lateral is a critical part of the region’s energy infrastructure network and its carbon reduction strategy, as it is designed to provide firm transportation service for the Intermountain Power Project (IPP) in Utah, which is working towards installing gas-fired generating units capable of using hydrogen, and developing hydrogen production and long-term storage capabilities;
- Local 798 recognizes Kern River’s history of designing, constructing and operating safe and reliable pipeline systems. The company has demonstrated this same commitment with Delta Lateral.
Due to the reasons discussed above, I support the Delta Lateral Project and urge the swift approval of necessary permits.
Signed,
[Names below]
**Local 798 will submit this petition to state and federal regulators and other decision makers to support the Delta Lateral Project.**
-
Sign Our Petition Supporting CCS Projects
Despite the significant environmental and economic benefits that Carbon Capture and Storage (CCS) infrastructure projects generate, activists aim to halt their development and kill the jobs they provide, many belonging to Local 798 members.
Stand up for our livelihoods! Sign our petition below that we will submit to decision makers in support of CCS projects across the country.
Dear [Official]:
As an energy consumer concerned about our nation’s economic future and the state of our environment, I am proud to support the investment in and development of Carbon Capture and Storage (CCS) infrastructure projects.
CCS projects receive bipartisan support precisely because they represent a common-sense solution to the challenge of “building back better” as we emerge from a pandemic-induced economic downturn, and as we continue to address the growing urgency to lower carbon emissions.
Given the energy limitations and high cost of infrastructure associated with “clean energy” alternatives, such as solar and wind power, it is difficult to imagine how federal climate objectives (including reaching net-zero carbon emissions by 2050) are met without widespread carbon capture and sequestration.
These projects also generate substantial economic activity, as many require installation of new infrastructure specifically to capture the CO2 emissions before they are emitted into the atmosphere. Summit Carbon Solutions’ Midwest Carbon Express Project, for example, is anticipated to support up to 17,000 jobs during construction alone and will install new infrastructure in 31 ethanol plants across five states, indirectly supporting jobs for workers in other industries across dozens of communities.
I support Carbon Capture and Storage pipeline projects for the following reasons:
- We must substantially increase carbon capture and storage capacity to help reach emission reduction goals; a July report from the U.S. Council on Environmental Quality found that a CCS industry large enough to meet the “net zero” emissions goal by 2050 would require 68,000 miles of new CO2 pipelines. This simply cannot happen unless we invest in meaningful change in our nation’s energy infrastructure now;
- CCS infrastructure is already making a significant difference in emissions reductions. One facility in Wyoming, for example, captures enough carbon dioxide each day to equate to removing 1.5 million cars from the roadways;
- CCS projects generate critical economic activity and support good-paying jobs for our nation's industry craftsmen, many of whom are Local 798 members;
- Carbon capture technology carries a remarkably safe track record. It has successfully been in use since the 1990s, and there are roughly 5,000 miles of CO2 pipeline and 40 ethanol plants using this technology in the U.S.
For these reasons, I urge decision makers to join me in support of Carbon Capture and Storage infrastructure projects – for our nation’s immediate and long-term future.
Signed
-
Pledge To Be An Energy Voter
With the right leadership and vision, we can ensure all Americans benefit from our nation’s emergence as an energy leader. It’s time to fulfill our bright energy future; it’s time to vote for candidates that support Local 798 jobs and the work that we do.
Join Local 798 by signing the petition and becoming an Energy Voter.
I understand the urgent need for clean, affordable and domestically sourced energy in my community, across my state and in throughout the nation. That is why I stand with political candidates and elected officials who show their support for an energy pipeline network that will safely and efficiently transport the nation’s abundant supply of domestic natural gas and oil supplies.
America is leading the world in oil and natural gas production. Working together, we can do even more. Producing, refining and transporting more domestic oil and natural gas will mean more abundant energy – and that means more affordable energy for American families and businesses.
We know there is enough potential domestic energy to serve all residential, business and industrial needs across the country. Yet, support for critical energy infrastructure is lacking among our political leaders.
To support my livelihood, my family and my community, I will enter the voting booth informed about how political leaders stand on the issue of energy infrastructure development. I will do my part to help elect leaders who recognize the tremendous benefits of and need to grow our energy transportation network and who support the union workforce that will build it.
Sincerely,
American Energy Industry Supporter
-
Support Texas Pipeliners
The Permian Global Access Pipeline (PGAP) is expected to submit the 7(c) Natural Gas Certificate Application with the Federal Energy Regulatory Commission (FERC) this year. The project was proposed in 2017 as part of Tellurian LNG's strategy to form a $7 billion pipeline network, along with the proposed Driftwood Liquified Natural Gas Terminal in Louisiana, supporting 15 thousand jobs in Texas and Louisiana.
Help secure jobs for local pipeliners! Sign the below petition that we will submit to FERC and other decision makers at the appropriate time.
I support the Permian Global Access Pipeline (PGAP), a critical investment in the Texas and Louisiana natural gas infrastructure network that will provide good jobs for Local 798 members and increase regional access to reliable, domestically sourced energy.
Once in service, the project will be an integral part of the proposed Tellurian Pipeline Network, which represents a $7 billion investment in the region's economic and energy future, including the creation of approximately 15 thousand jobs in Texas and Louisiana. Many of these jobs belong to the hard-working members of Local 798, a trades union representing some of the nation’s most skilled and dedicated craftsmen.
I support the Permian Global Access Pipeline for the following key reasons:
- the project team is incorporating all the most current federal standards into the design and operations of the pipeline, and in many instances, these standards will be exceeded to ensure the safest and most reliable system;
- the pipeline will be monitored 24 hours a day, 7 days a week to ensure ongoing safety;
- once in service, PGAP will help meet the region's growing energy demands, as it is designed to transmit 2 billion cubic feet of natural gas per day from West Texas to the Lake Charles area by late 2023 or early 2024;
- as part of the Tellurian Pipeline Network, PGAP will contribute to billions of dollars in state and local tax revenue, as well as an estimated 15 thousand jobs for regional construction workers.
Due to the reasons listed above, I urge the Federal Energy Regulatory Commission and other regulatory agencies to issue necessary permits for this critical project without delay.
Signed,
Permian Global Access Pipeline Supporter

John J Bradford 492sc