Keyshawn Greene

  • signed Line5 eis 2023 2023-12-29 09:32:10 -0600

    Sign Our Petition to the Army Corps

    The U.S. Army Corps of Engineers announced in March 2023 that it extended its environmental review of Enbridge Energy's Line 5 Straits Tunnel Project. The project's Environmental Impact Statement was previously set to be finished by late this year but now will be issued no earlier than Spring 2025.

    While Local 798 members are supportive of a comprehensive permitting process that ensures opportunity for review and comment, we are disappointed with the extended timeline on this project's already thorough environmental impact analysis. Join us in sending a message to the Army Corps in support of a swift review so construction can finally move forward.

    Dear Secretary:

    I stand with Pipeliners Local 798 in expressing disappointment in the U.S. Army Corps's decision to extend its environmental review of Enbridge Energy's Line 5 Straits Tunnel Project. The permitting process for Line 5 already ensured extensive opportunity for review and comment, through which Enbridge repeatedly demonstrated a commitment to maintaining the highest level of safety and environmental responsibility.

    Enbridge's proactive dedication to safety includes diligent 24/7 monitoring of the Straits crossing, regular inspections and operating the line at less than 25 percent of its maximum design capabilities to minimize stress on the pipeline steel and enhance safety. In November 2017, the company formally entered into an agreement with the state of Michigan outlining seven actions Enbridge was taking to protect the state’s water bodies within the project footprint. The following year, Enbridge announced another agreement with the state of Michigan that put in place enhanced inspection and operations protocols for the project. In the years that followed, Enbridge has continued to work closely with landowners, tribal leaders and safety experts to ensure the safest and most efficient pipeline operation.

    There are several reasons why I believe the Line 5 Straits Tunnel Project deserves swift approval from the Army Corps and other decision makers, including:

    • Enbridge has a proactive inspection program to monitor the fitness of Line 5, including evaluating the pipe’s interior inch by inch every five years using in-line inspection tools that provide detail on par with MRIs in the medical industry;
    • All products that enter the pipeline are inspected and treated to prevent corrosion, and the system is operated at a low pressure to minimize stress on the pipe – all in an effort to protect the pipeline and the Straits;
    • Over the past several years, Enbridge has paid tens of millions of dollars in property taxes in the state for its energy infrastructure projects, which has been invested in schools, roads and bridges and other important public services;
    • The Line 5 Straits Tunnel Project will create good jobs for the local workforce, many of whom include Local 798 members.

    The permitting process for Line 5 already ensured more than adequate opportunity for review and comment, through which Enbridge has demonstrated a clear plan with the project to help ensure an uninterrupted supply of reliable, affordable energy to Michigan and the region. This is why I ask the Army Corps to efficiently complete this review and approve necessary permits without any further delay.

    Signed,

    [Names Below]

    **Local 798 may submit this petition to state and federal regulators and other decision makers to support Line 5.**

  • commented on Mountain Valley 2023-12-29 09:26:30 -0600
    I am really trying get into pipelining bad I need some training and leave Florida asap

    Mountain Valley

    About the project

    MVP received federal approval in June 2023. The U.S. Supreme Court ordered in August for construction on MVP to resume, granting a request to lift lower court orders that had halted the project and (again) delayed its completion.

    In April 2022, the Federal Energy Regulatory Commission amended Mountain Valley Pipeline's 2017 Certificate of Public Convenience and Necessity, supporting project completion under water bodies with specific construction methods. MVP, which is already 94% complete, still needs authorization from other agencies for work in remaining streams and wetlands.

    With a vast supply of natural gas from Marcellus and Utica shale production, MVP is expected to provide up to two million dekatherms per day of firm transmission capacity to markets in the Mid- and South Atlantic regions of the U.S.

    You can learn more about MVP on its project website.