Greg Russell
-
Sign Our Petition to the Army Corps
In November 2024, the Wisconsin Department of Natural Resources approved permits for Enbridge's Line 5 Straits Tunnel Project in the state. The project still needs another key permit from the U.S. Army Corps of Engineers - expected to issue its Environmental Impact Statement in 2025. Local 798 members are supportive of a comprehensive permitting process that ensures opportunity for review and comment, and we are hopeful that our regulators will find no reason to extend the timeline on this project's already thorough environmental impact analysis.
Join us in sending a message to the Army Corps in support of a swift review so construction can finally move forward!
U.S. Army Corps of Engineers,
St. Paul District, Regulatory Division
332 Minnesota Street, Suite E1500
St. Paul, MN 55101Reference No. MVP-2020-00260-WMS; Application submitted pursuant to Section 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act
Dear Secretary:
I stand with Pipeliners Local 798 in supporting Enbridge's Line 5 Relocation Project's repositioning of its route outside the Bad River Indian Reservation. Enbridge has already repeatedly demonstrated a commitment to maintaining the highest level of safety and environmental responsibility throughout its permitting process for the project, including providing extensive opportunities for review and comment.
Below are just a few specific reasons why I believe the Line 5 Relocation Project deserves approval from the Army Corps and other decision makers:
- Enbridge has never wavered from its transparent decision making process, consistently involving community leaders and stakeholders in discussions regarding the project route and operation plans. To this end, Enbridge reached community easement agreements following thorough discussions with landowners along the proposed new Line 5 route outside the Bad River Reservation in Wisconsin;
- The project includes a route specifically designed to avoid culturally sensitive areas, such as Copper Falls State Park;
- While developing the Relocation Project, Enbridge specifically studied potential erosion risks and is planning stringent mitigation measures;
- The Line 5 Relocation Project will create good jobs for the local workforce, many of whom include Local 798 members - the most highly trained and dedicated pipeliners in the nation.
The company has continued to work closely with landowners, tribal leaders and safety experts to ensure the safest and most efficient pipeline operation. This consideration of best practices is what led Enbridge to plan the Relocation Project from the beginning. All of these above reasons highlight why I request that the Army Corps approves necessary permits for this project without any delay.
Signed,
[Names Below]
**Local 798 may submit this petition to state and federal regulators and other decision makers to support Line 5. Earlier this summer, in just under two weeks, our members collected more than 1,500 signatures on the below comment that we submitted on July 5 to the Army Corps before the comment period was originally slated to end on the EA. You can view this submission at this link. In the weeks that followed, we collected several hundred more signatures to submit before the extended comment period concluded on August 30. Any signature collected after 5:00 am CDT on August 30 may be included in future submissions to support this project.**
-
Sign Our Letter to Legislators
In July 2024, the US Senate Energy and Natural Resources Committee received strong bipartisan support for the Energy Permitting Reform Act (EPRA) of 2024, sponsored by Chairman Joe Manchin (I-WV) and Ranking Member John Barrasso (R-WY). This legislation, which will narrow the scope of review and streamline the approval process for infrastructure projects, advanced out of committee fewer than two weeks after it was introduced because lawmakers recognized how it is poised to play a critical role in supporting robust domestic energy development across the country - and ensuring good opportunities for our members.
We submitted the letter below with more than 2,300 signatures to congressional leadership in November 2024 supporting this critical bill. We will continue to collect signatures in anticipation of legislative discussions in the coming year.
RE: Energy Permitting Reform Act of 2024
Dear [Official]:
I stand with Pipeliners Local 798, a trades union representing the nation’s most skilled and dedicated industry craftsmen, in supporting Chairman Joe Manchin and Ranking Member John Barrasso's sponsored Energy Permitting Reform Act (EPRA) of 2024. This legislation, which has already received strong bipartisan support, provides much-needed transparency and efficiency to a permitting system that has long been dogged with unnecessary and costly red tape.
As we have seen too many times, delays in infrastructure permitting increases costs, threatens jobs and halts critical economic activity in our communities. To be more specific, the current system's inefficiencies have costed billions of dollars in investments and tens of thousands of U.S. jobs - many of which belong to the men and women of the United Association who have played a central role in building America's infrastructure network.
I support the common-sense provisions outlined in the Energy Permitting Reform Act of 2024 for the following specific reasons:
- Accelerates leasing and permitting decisions for energy projects on federal lands, helping to eliminate duplicative permit requirements and avoid long delays on critical project approvals;
- Requires the Federal Energy Regulatory Commission to issue a rule on interregional transmission planning and cost allocation within 180 days of a bill's enactment, ensuring the review process remains focused on the details that move project approval forward;
- Helps to ensure that consistent domestic offshore energy development continues in the coming years by mandating lease sales for both traditional and renewable energy development;
- By making FERC the lead agency for conducting environmental reviews of transmission projects that are subject to the National Environmental Policy Act, this simplifies the backstop authority and streamlines otherwise stuttering approvals;
- Helps accelerate the benefits of nearly $2 trillion provided by Congress for investments in infrastructure and clean energy, ultimately supporting sustainable energy infrastructure development and maintenance.
On behalf of all industry craftsmen who have struggled to make a living while waiting for construction approvals for infrastructure projects, I am proud to support the Energy Permitting Reform Act of 2024. I understand there is much more work to be done to address the incredible constraints facing pipeline infrastructure, but this legislation is certainly a significant step in that direction. This is why I urge you and your colleagues to lend support to push this forward.
Signed,
[Names below]
-
Sign Our Petition to FERC
In October 2024, Williams Companies filed an application with the Federal Energy Regulatory Commission (FERC) for the Southeast Supply Enhancement Project, a substantial expansion of the existing Transco pipeline’s system.
Nearly 2,400 advocates signed our petition below that we submitted to FERC on June 6, 2024 to support this project during its public scoping comment period. We will continue to collect signatures in anticipation of upcoming comment periods with our federal and state regulators. Be sure to add your name!
Dear [Official]:
I stand with Pipeliners Local 798 in support of the Southeast Supply Enhancement project, a critical expansion of the natural gas infrastructure network in Virginia, North Carolina, South Carolina, Georgia and Alabama, and the first large-scale takeaway expansion to be announced in the area since the long-delayed Mountain Valley Pipeline.
This system enhancement will help meet skyrocketing demands for affordable, reliable energy by moving more than 1.5 billion cubic feet of natural gas per day to its delivery network, a significant capacity increase that will be enough to power five or six new large, combined cycle plants and will ultimately move this domestically sourced gas to millions of American homes and businesses.
Williams has long demonstrated its commitment to ensure thorough consultation and cooperation with state, local and federal regulatory agencies, as well as community stakeholders throughout the permitting process. This is of particular importance for large scale projects such as this and it includes working with community members and industry experts to identify potential environmental issues or concerns and then to potentially modify the project design to further minimize possible impacts.
Below are just a few specific reasons why I support this project:
- The expansion will add enough natural gas pipeline capacity to meet the needs of 8.6 million homes, enabling Transco to address the growing natural gas-fired power generation, commercial, residential and industrial demand in the mid-Atlantic and southeast United States.
- The increase in pipeline capacity will encourage southern utilities to build new gas plants, opening the region to a generational investment in natural gas while strengthening grid reliability and driving down energy costs at a time when many families are struggling to handle their monthly bills.
- More urgently, the project will create good jobs for skilled industry craftsmen in the region, many of whom are long-time members of Pipeliners Local 798, as well as provide an economic boost to communities along the route.
The Southeast Supply Enhancement Project is poised to be a critical component of the region's energy infrastructure network – supporting good jobs, increasing access to domestically sourced natural gas and generating needed economic benefits. This is why I urge FERC and other agencies to issue necessary permits to ensure it remains on schedule.
Signed,
**By signing this petition, I agree to share my name on Pipeliners Local 798's submission(s) to federal and state decision makers in support of the Southeast Supply Enhancement project.**
-
Sign Our Comment
Over the course of two weeks in September, we prepared submissions - with more than 2,300 comments - to the Illinois Commerce Commission (ICC) and Iowa Utilities Board (IUB), as they accepted public comments on permits for the Mt. Simon Hub project, a pipeline proposed by Wolf Carbon Solutions and Archer Daniels Midland Company that will stretch from eastern Iowa into Illinois. Specifically, the project is seeking from the Illinois Commerce Commission a "Certificate of Authority to Construct and Operate a Carbon Dioxide Pipeline and when Necessary to take Interests in Property as Provided by the Law of Eminent Domain"; and from the Iowa Utilities Board a Hazardous Liquid Pipeline permit.
Thank you to all who signed our comment for submission! If you signed after September 21, we may include your name in future submissions to state and federal regulators to support this project.
Dear Secretary:
On behalf of United Association of Journeymen and Apprentices of the Plumbing and Pipe Fitting Industry of the United States and Canada (UA) and our more than 300,000 members, I want to express our continued support for the Mt. Simon Hub and encourage a thorough review and timely approval of this important project. We believe that Wolf Carbon Solutions’ Mt. Simon Hub will be integral to job creation, environmental improvement and long-term economic growth of our region.
As a proud UA member, I am excited at the prospect of playing a central role in making this project a reality. With the potential to create more than 2,700 construction jobs, generate over $478 million in wages and salaries and to contribute upwards of $75 million in state and local taxes for our state, the Mt. Simon Hub presents an extraordinary economic opportunity both for our union members and Illinois and Iowa overall.
The hardworking men and women of the UA will bring their extensive construction experience to bear to ensure that the Mt. Simon Hub is built to rigorous specifications and in compliance with strict federal and state standards. At the UA, we adhere to our Standard of Excellence in every project we work on. This Standard is made up of three pillars: safety, quality and productivity, each of which are essential to making our laborers the best-trained and highly-skilled in the world. Furthermore, we boast a five-year apprenticeship program that was the first nationally registered program recognized by the Department of Labor in the United States.
With the possibility of major economic and environmental benefits, my fellow union members and I are excited by the opportunity that the Mt. Simon Hub presents, and we urge you to approve Wolf Carbon Solutions’ application. Thank you for your consideration.
Signed,
**By signing this petition, I agree to share my name on Pipeliners Local 798's submission to the Illinois Commerce Commission (RE: Docket No. 23-0475) and to the Iowa Utilities Board (Docket No. HLP-2022-0002)**
-
Sign Our Petition Supporting Ridgeline
Enbridge is working with the Tennessee Valley Authority to design, construct and operate the Ridgeline Expansion Project, an expansion of Enbridge’s existing East Tennessee Natural Gas (ETNG) system. Ultimately, this would provide affordable and domestically sourced natural gas for the utility’s customers as the system continues to transition to cleaner energy.
Pending the receipt of all necessary permits, construction would begin in 2025 with a target in-service date of fall 2026. Sign our below petition that we will submit to respective decision makers as this project moves through the permitting process.
Dear [Secretary]:
I am proud to support Enbridge and the Tennessee Valley Authority as they develop the Ridgeline Expansion Project, a critical investment into the energy and economic future of Tennessee and the surrounding region.
Project construction will support good jobs for local craftsmen, many going to Pipeliners Local 798 members. Once complete, this expansion will provide Tennesseans with a lower-carbon, cleaner-burning energy source.
I support the Ridgeline Expansion Project for the following key reasons:
- The project is designed to meet the rising demand for natural gas, providing affordable and cleaner energy for the utility’s customers;
- The majority of the proposed route would be located within the existing system's right-of-way, which minimizes impacts to landowners and the environment;
- I understand the quality of work that Pipeliners Local 798 members and other regional craftsmen will put into this project to ensure its efficiency, safety and reliability. Local 798 workers have delivered on energy infrastructure projects like this for decades.
Simply put, projects like the Ridgeline Expansion Project are necessary to meet the rising demand for natural gas. This clean-burning energy currently fuels one-third of electric power generation and heats approximately half of all U.S. homes. This project will help more families and businesses in Tennessee realize the full advantages of this abundantly available resource.
I encourage FERC to issue necessary permits without delay, allowing the Ridgeline Expansion Project to meet its proposed in-service date in 2026.
Signed,
[Names below]
-
Sign Our Petition Supporting CCS Projects
Despite the significant environmental and economic benefits that Carbon Capture and Storage (CCS) infrastructure projects generate, activists aim to halt their development and kill the jobs they provide, many belonging to Local 798 members.
Stand up for our livelihoods! Sign our petition below that we will submit to decision makers in support of CCS projects across the country.
Dear [Official]:
As an energy consumer concerned about our nation’s economic future and the state of our environment, I am proud to support the investment in and development of Carbon Capture and Storage (CCS) infrastructure projects.
CCS projects receive bipartisan support precisely because they represent a common-sense solution to the challenge of “building back better” as we emerge from a pandemic-induced economic downturn, and as we continue to address the growing urgency to lower carbon emissions.
Given the energy limitations and high cost of infrastructure associated with “clean energy” alternatives, such as solar and wind power, it is difficult to imagine how federal climate objectives (including reaching net-zero carbon emissions by 2050) are met without widespread carbon capture and sequestration.
These projects also generate substantial economic activity, as many require installation of new infrastructure specifically to capture the CO2 emissions before they are emitted into the atmosphere. Summit Carbon Solutions’ Midwest Carbon Express Project, for example, is anticipated to support up to 17,000 jobs during construction alone and will install new infrastructure in 31 ethanol plants across five states, indirectly supporting jobs for workers in other industries across dozens of communities.
I support Carbon Capture and Storage pipeline projects for the following reasons:
- We must substantially increase carbon capture and storage capacity to help reach emission reduction goals; a July report from the U.S. Council on Environmental Quality found that a CCS industry large enough to meet the “net zero” emissions goal by 2050 would require 68,000 miles of new CO2 pipelines. This simply cannot happen unless we invest in meaningful change in our nation’s energy infrastructure now;
- CCS infrastructure is already making a significant difference in emissions reductions. One facility in Wyoming, for example, captures enough carbon dioxide each day to equate to removing 1.5 million cars from the roadways;
- CCS projects generate critical economic activity and support good-paying jobs for our nation's industry craftsmen, many of whom are Local 798 members;
- Carbon capture technology carries a remarkably safe track record. It has successfully been in use since the 1990s, and there are roughly 5,000 miles of CO2 pipeline and 40 ethanol plants using this technology in the U.S.
For these reasons, I urge decision makers to join me in support of Carbon Capture and Storage infrastructure projects – for our nation’s immediate and long-term future.
Signed
-
Sign Our Petition Supporting Hydrogen Pipelines
Upgrading and modifying existing gas pipelines and midstream infrastructure to carry biofuels and low-carbon hydrogen would generate good jobs for our nation’s construction workforce and boost economic activity while supporting low-carbon goals.
Sign our petition below supporting hydrogen pipeline infrastructure and the jobs that these projects will provide to craftsmen across the country, including many Local 798 members.
As a forward-thinking supporter of a strong energy industry, I join Pipeliners Local 798 in support of utilizing existing infrastructure and developing new pipelines for the purpose of transporting renewable hydrogen.
By making lines hydrogen-capable, we can best prepare for a responsible energy future while helping to grow opportunities for industry craftsmen across the nation, many of whom are members of Pipeliners Local 798, a trades union representing the most highly trained, skilled and dedicated men and women in the energy industry.
The U.S. has a robust natural gas transportation and storage network – approximately three million miles of natural gas pipelines run throughout the nation – yet, these critical pipelines could become stranded assets within decades, as government leaders push towards aggressive carbon emission goals. This presents both a tremendous challenge and opportunity to utilize the existing pipeline network to also transport other clean-burning energy sources like renewable hydrogen.
While I believe that natural gas should play a vital role in our energy system for years to come, I recognize the growing urgency to invest in renewable energy sources. Modifying gas pipelines and midstream infrastructure to carry biofuels and low-carbon hydrogen is smart strategy, as these projects generate critical economic activity, support good jobs and ensure the delivery of reliable, clean energy to American homes and businesses.
I support investment in renewable hydrogen pipeline infrastructure for the following key reasons:
- Utilizing existing infrastructure for renewable hydrogen distribution supports good job opportunities for industry craftsmen and generates critical local and state economic activity;
- While renewables like solar and wind are limited by electrical grids, hydrogen can be efficiently transported by pipelines, which are built and maintained by a skilled workforce of pipefitters, welders and other craftsmen who depend on infrastructure projects to provide for their families;
- Hydrogen in distribution pipelines would help decarbonize industrial processes, supporting environmental goals.
Upgrading and modifying existing gas pipelines and midstream infrastructure to carry hydrogen would generate good jobs for our nation’s construction workforce and boost economic activity while supporting low-carbon goals. This is why I urge decision makers to join me in supporting these critical infrastructure projects.
Signed
[Signers below]
-
Sign Our Comment to FERC
The Delta Lateral Project will expand natural gas capacity of Kern River Gas Transmission's existing transmission system in Utah while supporting good jobs for local craftsmen.
In December 2021, Local 798 submitted the below petition with 2,080 signatures to the Federal Energy Regulatory Commission regarding the project’s draft Environmental Impact Statement. In February 2022, FERC released the final DEIS. In anticipation of more public comment periods ahead, please sign this petition that we will submit to other regulators and decision makers in support of Delta Lateral.
Dear Secretary Bose:
I stand with Pipeliners Local 798 in support of Kern River Gas Transmission Company's Delta Lateral Project. This important project will enable Kern River to meet rising natural gas demands in the area and will support good jobs for local craftsmen, including Local 798 members.
In its draft EIS, FERC found the project’s environmental impacts would be reduced to “less-than-significant levels”due to the minimization and mitigation measures proposed by Kern River and recommended by the Commission. Project leaders remain committed to these mitigation efforts and continue to collaborate with stakeholders and environmental experts to develop the most responsible and efficient development plan. I see no reason to alter this review in the final EIS.
Overall, I support the Delta Lateral Project for the following reasons:
- Project leaders have consistently collaborated with stakeholders and environmental experts to ensure it meets or exceeds federal safety standards while developing the most efficient and responsible pipeline route;
- Delta Lateral is a critical part of the region’s energy infrastructure network and its carbon reduction strategy, as it is designed to provide firm transportation service for the Intermountain Power Project (IPP) in Utah, which is working towards installing gas-fired generating units capable of using hydrogen, and developing hydrogen production and long-term storage capabilities;
- Local 798 recognizes Kern River’s history of designing, constructing and operating safe and reliable pipeline systems. The company has demonstrated this same commitment with Delta Lateral.
Due to the reasons discussed above, I support the Delta Lateral Project and urge the swift approval of necessary permits.
Signed,
[Names below]
**Local 798 will submit this petition to state and federal regulators and other decision makers to support the Delta Lateral Project.**
-
Sign Our Willow Project Support Petition
The Willow Master Development Plan Project (Willow Project) is a critical energy project in the North Slope of Alaska from ConocoPhillips that is expected to generate billions of dollars in local, state and federal revenue and support 2,000 construction jobs and 300 permanent jobs – many going to Local 798 members.
In March 2023, the Biden Administration approved the project - and a federal judge upheld the approval later that year. The project likely faces legal challenges, however, that would stall construction. Sign our petition below supporting this important project as it faces more milestones ahead.
I commend the Biden Administration for showing its support for the Willow Master Development Plan Project (Willow Project), and I urge state and federal decision makers to follow suit to ensure swift approval of this critical project that will generate much-needed economic activity in Alaska, supply affordable, domestic energy and create good-paying jobs for the area workforce.
The project’s approval comes after years of analysis, significant public input, completion of the environmental impact statement (EIS) and biological opinion (BiOp) and consultation with cooperating agencies such as the U.S. Fish and Wildlife Service and the U.S. Army Corps of Engineers.
Throughout every stage, the Willow Project has demonstrated its commitment to transparency, public involvement and environmental safety. The comment period for the Draft Environmental Impact Statement (EIS) and Supplement Draft EIS, for example, generated more than 31,000 submissions during comment periods and influenced ConocoPhillips to amend its application to modify its project design, including a change to incorporate a new module delivery option. In the end, the project’s final EIS, which consists of seven volumes and over 3,6000 pages, took more than two years and some six million dollars to draft, evaluate and finalize.
Project development would generate thousands of jobs for area craftsmen and produce substantial revenue for the federal government, State of Alaska, North Slope Borough and communities in the NPR-A.
I support the Willow Project due to the following key benefits:
- The infrastructure will generate a potential $10 billion dollars in federal, state and local economic activity over its lifetime;
- Project construction is expected to support 2,000 jobs, and operation will require approximately 300 permanent jobs, many of which will go to Local 798 members;
- The project is designed to produce approximately 586 million barrels of oil over its lifetime, including up to 160,000 barrels a day, helping to reduce U.S. dependence on foreign oil;
- The project has undergone rigorous review of potential environmental and ecological impacts. The Army Corps, in particular, found the Willow Project would “not cause significant” negative impacts.
The Biden Administration took the right step with its court filing in support of the Willow Project, and I urge other decision makers to issue necessary permits in a timely manner.
Signed,
[Names below]
-
Pledge To Be An Energy Voter
With the right leadership and vision, we can ensure all Americans benefit from our nation’s emergence as an energy leader. It’s time to fulfill our bright energy future; it’s time to vote for candidates that support Local 798 jobs and the work that we do.
Join Local 798 by signing the petition and becoming an Energy Voter.
I understand the urgent need for clean, affordable and domestically sourced energy in my community, across my state and in throughout the nation. That is why I stand with political candidates and elected officials who show their support for an energy pipeline network that will safely and efficiently transport the nation’s abundant supply of domestic natural gas and oil supplies.
America is leading the world in oil and natural gas production. Working together, we can do even more. Producing, refining and transporting more domestic oil and natural gas will mean more abundant energy – and that means more affordable energy for American families and businesses.
We know there is enough potential domestic energy to serve all residential, business and industrial needs across the country. Yet, support for critical energy infrastructure is lacking among our political leaders.
To support my livelihood, my family and my community, I will enter the voting booth informed about how political leaders stand on the issue of energy infrastructure development. I will do my part to help elect leaders who recognize the tremendous benefits of and need to grow our energy transportation network and who support the union workforce that will build it.
Sincerely,
American Energy Industry Supporter
Greg Russell 1228sc