Mike Stewart

  • commented on Driftwood Pipeline 2024-01-20 10:45:52 -0600
    Worked in pipeline industry for over 25 years. Only union job was for Sheehan . We did the Golden Pass project from Texas to Louisiana in 07/08/09.I ran the pipe yard, skid trucks, and material yard when I got all of pipe layed.Pat Tobias was the spread man. Looking for anything in pipeline work. I drove lowboys all my life’s d was a fill in operator when needed. I’m 71 but still in pretty good shape and not ready to retire. Thanks in advance.

    Driftwood Pipeline

    About the project

    Driftwood proposes to construct and operate dual 42-inch-diameter natural gas pipelines, referred to as the Line 200 and Line 300 project, originating near Ragley in Beauregard Parish, Louisiana southward to a proposed receiver facility near Carlyss in Calcasieu Parish, Louisiana. Additional facilities include one new compressor station, eleven meter stations, six mainline valves, and other aboveground facilities. The project would provide a maximum seasonal capacity of 5.7 billion cubic feet of natural gas per day to the Lake Charles market. 

    FERC is accepting public comments on the project's draft Environmental Impact Statement through July 5, 2022.

    Click here to view the project website.